General Tech
Greenvolt begins building 600 MW/2.4 GWh BESS in Poland
Greenvolt has started constructing a 600 MW / 2.4 GWh battery energy storage system (BESS) in Poland. The facility, located in the town of Włocławek, is expected to be operational in 2025. The project is being developed in collaboration with the Polish energy company, PGE, and is part of a larger effort to increase Poland's renewable energy capacity. The BESS will be used to stabilize the grid and provide frequency regulation services.
Read the full article at ess-news.com →